The referendum includes $7.3 million in General Obligation bonds, which only covers demolition and construction costs.
The surging outdoor temperatures of this past week have made outdoor work extra challenging and as a result a town project that was supposed to begin is being delayed. The pause in work on the North ...
With the referendum’s failure, the town is back to square one, with its options to repair, replace, or demolish the current ...
<br/><br/>***If Dotson gets back to me I will include his comments***<br/><br/>The Town of North Beach is one step closer to becoming a waterfront wedding destination after the town council approved a ...